Sustainable Development
Eurohub’s Logistics Center, located in the Keratea Industrial Park, is one of the most advanced facilities in Southeastern Europe, classified as Z2. This state-of-the-art project boasts a zero environmental footprint, prioritizes safety, and offers exceptional conditions for both employees and visitors.
Design Philosophy
The facility spans an area of 16,904.93 m², with the building itself covering 14,185.92 m². The design and permitting process took 16 months, while the project was completed in just 11 months. The south-facing complex is spread across four levels and a basement, which contains a fire tank. The ground floor, which serves as the main section of the building, features the primary entrance, a visitor and staff foyer, changing rooms, waiting areas, and a loading and order deposit area. The design enables the loading process to be fully automated, eliminating direct contact between workers and drivers. This system not only saves time but, more importantly, enhances the safety of the workforce.
Technological Integration
Additionally, the Logistics Center utilizes advanced VNA (Very Narrow Aisle) technology, enabling the efficient placement, storage, and retrieval of the company’s pharmaceutical products. This system is integrated with a Personal Security System (PPS) and energy-saving features, optimizing storage density and maximizing available space.
Functional Layout
The first floor houses a second storage area, along with an outdoor semi-open break area for staff. The second and top floors are dedicated to office spaces for employees and administrative staff, along with the necessary support facilities. The building is fully accessible to people with disabilities. Furthermore, the facility features automation for energy consumption and maintains a zero environmental impact from the company’s operations, making it an exemplary model of sustainable development.